- Additional Parts List:
- Small Bungee Cords: 1 cord (cut in half) is used per arch
- Small 6″ Zip Ties: 4 zip ties used per arch
- #4 EMT Conduit Hangar: 2 per arch (with 2″ HDPE the fit is slightly too tight and 1/4″ washers may be used as spacers)
- 1/2″ EMT for the horizontal bracing: Flatten ends of the horizontal bracing and drill 1/4″ hole so they fit into the conduit hangars.
- 1/2″ PVC for the stabilizing legs.
- #8 x 1/2″ Sheet Metal Screws: (4-6 per arch)
3D printing parts is a slow process and we have a whole print farm running 24/7 to fulfill orders and build stock of the more popular items. If you order a product that shows “made to order” we will move it directly to the print queue where it will be printed as soon as possible. While normal processing times for most orders with made to order items is less than a week, it can fluctuate. Very large orders can also experience longer than normal processing times as well because of the high number of hours it takes to produce lots of parts. If processing times are expected to be longer than two weeks before shipping, there will be a banner at the top of the website indicating the expected wait times. See the FAQ page for more info.
All of our 3D printed parts use PETG filament which provides good flexibility and resistance to UV exposure when used seasonally.
Reviews
There are no reviews yet.